[featured_image]
  • Version
  • Download 12850
  • File Size 74.10 KB
  • File Count 1
  • Create Date 30.03.2020
  • Last Updated 30.03.2020

60-day extension for the closing of the sale of the biodigestion and biomethane production plant at Calimera (LE)

Attached Files

FileAction
ALGOWATT_PR09_31-03-2020-EN.pdfDownload