[featured_image]
  • Version
  • Download 12110
  • File Size 75.45 KB
  • File Count 1
  • Create Date 01.06.2020
  • Last Updated 01.06.2020

Extension up to 30 June 2020 for the closing of the sale of the biodigestion and biomethane production plant at Calimera (LE)

Attached Files

FileAction
ALGOWATT_PR17_01-06-2020-EN.pdfDownload